![]() |
![]() |
![]() ![]() |
| > Highwood Groundwork Project Photo Gallery: Brighton Deaf School, Brighton | ||||
This project, contracted by John Farrington & Co, involved the removal of an existing patio and the laying of a new patio. In addition, the existing drainage was replaced with the installation of a new stormwater drainage system. |
||||
| < Previous Project | ||||
HOME | SERVICES | PROJECTS | TREE SURGERY| CONTACT |
||
| © Copyright Highwood-Uk | Website Designed & Maintained by: |
|