Highwood Groundwork Groundwork Contractor Sussex Groundwork Contractor SussexRainwater Harvesting SystemGroundwork Contractor Eastbourne
Rainwater Harvesting SystemsSewage Treatment PlantSewage Treatment Plant
Groundwork HomeGroundwork ServicesGroundwork Project PortfolioHighwood Tree SurgeryGroundwork Contact Details Groundwork Contractor SussexGroundwork KentGroundwork Contractor Sussex
Sewage Treatment Plant
> Highwood Groundwork Project Photo Gallery: Reinforced Raft Garage Foundations, Oxted
Rainwater Harvesting Systems
This project, contracted by Bishop & Levett, involved the construction of reinforced raft foundations for a four bay car garage. Firstly the existing retaining wall needed to be demolished, levels reduced and the foundations set-out. The foundations were then constructed and concrete was compacted over the top. Steel caging followed to add strength, which was then half-filled with concrete. The foundations were finally shuttered and filled with concrete to create a tampered final floor. A new retaining wall was then constructed, after which Prime Oak built the garage on the newly concreted base. The driveway leading to the garage was then tarmaced. Finally a new Rainwater Harvesting System was installed.
 
 
 
     
  < Previous Project  
     
HOME | SERVICES | PROJECTS | TREE SURGERY| CONTACT
© Copyright Highwood-Uk
Website Designed & Maintained by:
mdcdesign